AP1000 Non-Safety Related Ball and Plug Valves ASME B16.34 (Commodity Code PV40) for Poland AP1000® Project
Zamawiający zmienił to ogłoszenie. Zmiana z 22.09.2026. Aktualny termin składania ofert: 12.10.2026. Zobacz aktualną wersję →
Aktywne przetargi podobne do tego
Termin składania ofert minął. Poniżej otwarte postępowania o zbliżonym przedmiocie zamówienia.
Najważniejsze informacje
Zamawiający Westinghouse Electric Poland Sp.z.o.o (Kraków, woj. małopolskie) opublikował 27.04.2026 ogłoszenie o zamówieniu na dostawy.
- Wymagane było wadium.
Opis zamówienia
Description:
1. 1. Experienced suppliers capable of fabrication, procurement of materials, assembly, documentation, inspection, factory acceptance testing, packaging, quality assurance/quality controls, special tooling, and fulfillment of all responsibilities to supply Non-Safety Related, ASME B16.34 Ball and Plug Valves as defined per the requirements of Westinghouse Electric Company LLC specifications, must (i) contact (email and/or phone call) the Westinghouse contact person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person.
2. The qualification criteria shall include but is not necessarily limited to (i) demonstrated experience in furnishing similar scopes; (ii) The Supplier shall maintain a written Quality Assurance Program compliant with Purchase Order and Design Specification requirements (e.g. program that conforms to the applicable requirements of ISO 9001), including controls to prevent counterfeit or fraudulent items (CFSI); the program and its implementation are subject to review and verification before and during work execution; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities as further described in the AP1000 supplier qualification questionnaire.
3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets or does not meet the qualification requirements. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project.
4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA). Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal.
5. The Request for Proposal (RFP) document will be for a three (3) unit project.
6. The scope of work for the subject RFP will include:
• Overall project management, planning, scheduling, and reporting.
• Procurement of material.
• Material receipt
• Preparation of necessary manufacturing drawings and procedures (welding, cleaning, marking, coating, packaging, etc.), work packages (travelers), internal manufacturing and assembly procedures, quality and inspection plan(s), factory acceptance testing procedure, quality documentation packages, personnel and process qualifications, and handling/storage instructions.
• Non-Destructive Examination (NDE) and other Testing and Qualification requirements as required by Design Specification.
7. The RFP document will require furnishing of a Parent Company Guarantee if the pre-qualified Supplier is an affiliate of Parent Company.
8. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD. Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices).
9. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase.
10. Any companies that do not meet mandatory compliance requirements in section 3 will be excluded.
11. The procedure for companies to gain access to proprietary information, if required, will be subject to compliance with the executed PIA/NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFP document.
12. If a large number of companies express interest and submit a completed AP1000 Supplier Questionnaire, the Contracting Authority reserves the right to conduct a preliminary down-selection of companies that demonstrate the highest qualification, capacity, and capability to perform the required scope of work.
13. The Contracting Authority also reserves the right to exclude any of the following from this Competitive Bidding process:
A. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or
B. economic operators who rely in the Competitive bidding process on capacities of any entities from countries not covered by the GPA with the EU.
All such decisions by the Contracting Authority are final and shall not be subject to
complaint or dispute.
14. The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
Warunki postępowania
- Tryb postępowania
- Procedura otwarta
- Podział na części
- Bez podziału na części
- Dokumenty i składanie ofert
- westinghousenuclear.com
Na podstawie treści ogłoszenia. Wiążące są zapisy ogłoszenia i dokumentacji zamówienia (SWZ).
Harmonogram postępowania
- Publikacja ogłoszenia — etap zakończony27.04.2026
- Termin składania ofert19.05.2026nieaktualne
- Związanie ofertą — etap planowany3 miesiące
Ogłoszenia w tym postępowaniu
- Ogłoszenie o zamówieniu09.04.2026
- Ogłoszenie o zamówieniu09.04.2026
- Ogłoszenie o zamówieniu (ta strona)27.04.2026
- Ogłoszenie o zamówieniu27.04.2026
- Ogłoszenie o zamówieniu22.05.2026
- Ogłoszenie o zamówieniu10.06.2026
- Ogłoszenie o zamówieniu22.07.2026
- Ogłoszenie o zamówieniu28.07.2026
- Ogłoszenie o zamówieniu22.09.2026
- Ogłoszenie o zamówieniu22.09.2026
- …i 5 innych ogłoszeń w tym postępowaniu
Treść ogłoszenia
1Nabywca
- Oficjalna nazwa
- Westinghouse Electric Poland Sp.z.o.o
- tomonrl@westinghouse.com
- Sektor działalności podmiotu zamawiającego
- Działalność dotycząca sektora energii elektrycznej
2Procedura
- Tytuł
- AP1000 Non-Safety Related Ball and Plug Valves ASME B16.34 (Commodity Code PV40) for Poland AP1000® Project
- Opis
Description: 1.
1. Experienced suppliers capable of fabrication, procurement of materials, assembly, documentation, inspection, factory acceptance testing, packaging, quality assurance/quality controls, special tooling, and fulfillment of all responsibilities to supply Non-Safety Related, ASME B16.34 Ball and Plug Valves as defined per the requirements of Westinghouse Electric Company LLC specifications, must (i) contact (email and/or phone call) the Westinghouse contact person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person.
2. The qualification criteria shall include but is not necessarily limited to (i) demonstrated experience in furnishing similar scopes; (ii) The Supplier shall maintain a written Quality Assurance Program compliant with Purchase Order and Design Specification requirements (e.g. program that conforms to the applicable requirements of ISO 9001), including controls to prevent counterfeit or fraudulent items (CFSI); the program and its implementation are subject to review and verification before and during work execution; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities as further described in the AP1000 supplier qualification questionnaire.
3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets or does not meet the qualification requirements. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project.
4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA). Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal.
5. The Request for Proposal (RFP) document will be for a three (3) unit project.
6. The scope of work for the subject RFP will include:
• Overall project management, planning, scheduling, and reporting.
• Procurement of material.
• Material receipt
• Preparation of necessary manufacturing drawings and procedures (welding, cleaning, marking, coating, packaging, etc.), work packages (travelers), internal manufacturing and assembly procedures, quality and inspection plan(s), factory acceptance testing procedure, quality documentation packages, personnel and process qualifications, and handling/storage instructions.
• Non-Destructive Examination (NDE) and other Testing and Qualification requirements as required by Design Specification.
7. The RFP document will require furnishing of a Parent Company Guarantee if the pre-qualified Supplier is an affiliate of Parent Company.
8. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD. Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices).
9. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase.
10. Any companies that do not meet mandatory compliance requirements in section 3 will be excluded.
11. The procedure for companies to gain access to proprietary information, if required, will be subject to compliance with the executed PIA/NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFP document.
12. If a large number of companies express interest and submit a completed AP1000 Supplier Questionnaire, the Contracting Authority reserves the right to conduct a preliminary down-selection of companies that demonstrate the highest qualification, capacity, and capability to perform the required scope of work.
13. The Contracting Authority also reserves the right to exclude any of the following from this Competitive Bidding process: A. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or B. economic operators who rely in the Competitive bidding process on capacities of any entities from countries not covered by the GPA with the EU. All such decisions by the Contracting Authority are final and shall not be subject to complaint or dispute.
14. The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
- Identyfikator procedury
- a8578dc9-7aa8-4492-be34-b929682cb152
- Rodzaj procedury
- Otwarta
- Procedura jest przyspieszona
- Nie
- Charakter zamówienia
- Dostawy
- Główna klasyfikacja
- (cpv): 42131140 Zawory obniżające ciśnienie, sterujące, kontrolne lub bezpieczeństwa
- Podpodział krajowy (NUTS)
- Gdański (PL634)
- Kraj
- Polska
- Informacje dodatkowe
- Deadline (Qualification self-assessment Submittal): 15 business days from issuance of this notification RFP Document Issuance: April, 2026 Supplier Proposals Due: June 22, 2026 Order Award Date: 2nd Quarter, 2027 Updates: Not applicable Soft Copy: PDF copy of the Advanced RFP Qualification Notice included About Contracting Authority: Westinghouse Electric Company LLC is engaged in the business of design and development of commercial nuclear power facilities, including the AP1000® passive-safety pressurized water reactor. Owner Name: POLSKIE ELEKTROWNIE JĄDROWE SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ, a limited liability company with registered office at Ul. Jana z Kolna 11, 80-864 Gdańsk, Poland. Correspondence address: Aleje Jerozolimskie 132/136, 02-305 Warsaw, Poland. Project Description: Nuclear Power Plant, utilizing AP1000® reactor technology, composed of three (3) specified reactor units and all other nuclear and non-nuclear facilities, with installed total capacity up to 3,750 MW. Project Location: Municipality of Choczewo (Lubiatowo-Kopalino), in the Republic of Poland. Notice Type: Advanced RFP Qualification Notice Bidding Type: Competitive bidding Notice No.: Poland AP1000 PV40 Sanctions The company shall certify that (i) is not subject to sanctions, and (ii) does not present a threat to the security interests of Poland, in particular that they are not (a) a Russian national, or a natural or legal person, entity or body established in Russia or (b) a legal person, entity or body whose proprietary rights are directly or indirectly owned for more than fifty percent (50%) by an entity referred to in point (a) of this section or (c) a natural or legal person, entity or body acting on behalf or at the direction of an entity referred to in point (a) or (b) of this Section. “Sanctions” shall mean measures aimed at maintaining or restoring international peace and security enacted by the United Nations and/or the European Union and/or the Poland and/or the US, or any such sanctions law applicable to the company or undertaking's such as sectoral measures, economic and financial measures, or measures introduced against countries (embargoes), natural or legal persons or groups or non-state entities (blocking measures). Delivery Restrictions The following delivery restrictions are applicable for items to be provided for the Project: Any manufacturing or supply by an individual, entity or from a country of origin on which sanctions or embargoes are imposed by competent authorities in accordance with the law. No equipment (or parts thereof) and no materials can be manufactured in or imported from the Russian Federation or from parts of Ukraine which are not under factual control of the Ukrainian government in Kiev (currently: Crimea, Donetsk Province (Donetsk Oblast) and Luhansk Province (Luhansk Oblast)). No equipment or parts thereof can be manufactured or supplied by Russian companies, individuals, suppliers or companies from parts of Ukraine which are not under factual control of the Ukrainian government in Kiev (currently: Crimea, Donetsk Province (Donetsk Oblast) and Luhansk Province (Luhansk Oblast)). Any other individual, entity or country of origin deemed by the Republic of Poland as restricted or constituting a threat to the national security or security interests of the Republic of Poland.
- Informacje dodatkowe
- Sanctions The company shall certify that (i) is not subject to sanctions, and (ii) does not present a threat to the security interests of Poland, in particular that they are not (a) a Russian national, or a natural or legal person, entity or body established in Russia or (b) a legal person, entity or body whose proprietary rights are directly or indirectly owned for more than fifty percent (50%) by an entity referred to in point (a) of this section or (c) a natural or legal person, entity or body acting on behalf or at the direction of an entity referred to in point (a) or (b) of this Section. “Sanctions” shall mean measures aimed at maintaining or restoring international peace and security enacted by the United Nations and/or the European Union and/or the Poland and/or the US, or any such sanctions law applicable to the company or undertaking's such as sectoral measures, economic and financial measures, or measures introduced against countries (embargoes), natural or legal persons or groups or non-state entities (blocking measures). Delivery Restrictions The following delivery restrictions are applicable for items to be provided for the Project: Any manufacturing or supply by an individual, entity or from a country of origin on which sanctions or embargoes are imposed by competent authorities in accordance with the law. No equipment (or parts thereof) and no materials can be manufactured in or imported from the Russian Federation or from parts of Ukraine which are not under factual control of the Ukrainian government in Kiev (currently: Crimea, Donetsk Province (Donetsk Oblast) and Luhansk Province (Luhansk Oblast)). No equipment or parts thereof can be manufactured or supplied by Russian companies, individuals, suppliers or companies from parts of Ukraine which are not under factual control of the Ukrainian government in Kiev (currently: Crimea, Donetsk Province (Donetsk Oblast) and Luhansk Province (Luhansk Oblast)). Any other individual, entity or country of origin deemed by the Republic of Poland as restricted or constituting a threat to the national security or security interests of the Republic of Poland.
- Powody wykluczenia źródła
- Dokumenty zamówienia
3Część zamówienia 1
- Tytuł
- AP1000 Non-Safety Related Ball and Plug Valves ASME B16.34 (Commodity Code PV40) for Poland AP1000® Project
- Opis
Description: 1.
1. Experienced suppliers capable of fabrication, procurement of materials, assembly, documentation, inspection, factory acceptance testing, packaging, quality assurance/quality controls, special tooling, and fulfillment of all responsibilities to supply Non-Safety Related, ASME B16.34 Ball and Plug Valves as defined per the requirements of Westinghouse Electric Company LLC specifications, must (i) contact (email and/or phone call) the Westinghouse contact person identified in section 1 to express interest and request an AP1000 supplier qualification questionnaire, and (ii) upon receipt, complete the AP1000 supplier qualification questionnaire with sufficient detail for Westinghouse evaluation and return it via email to the Westinghouse contact person.
2. The qualification criteria shall include but is not necessarily limited to (i) demonstrated experience in furnishing similar scopes; (ii) The Supplier shall maintain a written Quality Assurance Program compliant with Purchase Order and Design Specification requirements (e.g. program that conforms to the applicable requirements of ISO 9001), including controls to prevent counterfeit or fraudulent items (CFSI); the program and its implementation are subject to review and verification before and during work execution; (iii) certification of compliance with all applicable governmental policies, requirements, laws and regulations, applicable international treaties or agreements, and other regulatory requirements; (iv) financial standing (solvency) and (v) verification of capabilities as further described in the AP1000 supplier qualification questionnaire.
3. Upon evaluation of your response to the AP1000 supplier qualification questionnaire, Westinghouse will determine if your company meets or does not meet the qualification requirements. Submission of the AP1000 supplier qualification questionnaire does not automatically qualify your company to be supplier for the project.
4. Each qualified Supplier will be required to execute a Proprietary Information Agreement (PIA). Companies meeting the qualification criteria and who have executed the PIA will be invited to submit a proposal.
5. The Request for Proposal (RFP) document will be for a three (3) unit project.
6. The scope of work for the subject RFP will include:
• Overall project management, planning, scheduling, and reporting.
• Procurement of material.
• Material receipt
• Preparation of necessary manufacturing drawings and procedures (welding, cleaning, marking, coating, packaging, etc.), work packages (travelers), internal manufacturing and assembly procedures, quality and inspection plan(s), factory acceptance testing procedure, quality documentation packages, personnel and process qualifications, and handling/storage instructions.
• Non-Destructive Examination (NDE) and other Testing and Qualification requirements as required by Design Specification.
7. The RFP document will require furnishing of a Parent Company Guarantee if the pre-qualified Supplier is an affiliate of Parent Company.
8. Proposal may be requested in EURO, PLN (Polish Zloty), and/or USD. Furthermore, the proposals may be requested in a combination of Fixed Price (not subject to any price adjustment) and Firm Price (subject to adjustment per mutually agreed upon indices).
9. The final supplier evaluation and selection criteria will include price, compliance with technical, quality, and commercial requirements, experience in furnishing similar equipment, past performance, and compliance with the terms and conditions of purchase.
10. Any companies that do not meet mandatory compliance requirements in section 3 will be excluded.
11. The procedure for companies to gain access to proprietary information, if required, will be subject to compliance with the executed PIA/NDA, Applicable Export Laws, Applicable Laws, and Applicable Safeguards Laws which will be included in the RFP document.
12. If a large number of companies express interest and submit a completed AP1000 Supplier Questionnaire, the Contracting Authority reserves the right to conduct a preliminary down-selection of companies that demonstrate the highest qualification, capacity, and capability to perform the required scope of work.
13. The Contracting Authority also reserves the right to exclude any of the following from this Competitive Bidding process: A. any economic operator that is directly or indirectly owned or controlled by an entity from a country not covered by the Government Procurement Agreement ("GPA") with the EU; or B. economic operators who rely in the Competitive bidding process on capacities of any entities from countries not covered by the GPA with the EU. All such decisions by the Contracting Authority are final and shall not be subject to complaint or dispute.
14. The Customer shall be responsible for monitoring the Contractor’s compliance with the competitive procedure. Thus, the Contractor shall transmit any complaint received to the Customer. The Customer reserves the right to audit of the Contractor’s selection of subcontractors under the competitive procedure, in line with the requirements of the Prime Contract.
- Charakter zamówienia
- Dostawy
- Główna klasyfikacja
- (cpv): 42131140 Zawory obniżające ciśnienie, sterujące, kontrolne lub bezpieczeństwa
- Podpodział krajowy (NUTS)
- Gdański (PL634)
- Kraj
- Polska
- Informacje dodatkowe
- Sanctions The company shall certify that (i) is not subject to sanctions, and (ii) does not present a threat to the security interests of Poland, in particular that they are not (a) a Russian national, or a natural or legal person, entity or body established in Russia or (b) a legal person, entity or body whose proprietary rights are directly or indirectly owned for more than fifty percent (50%) by an entity referred to in point (a) of this section or (c) a natural or legal person, entity or body acting on behalf or at the direction of an entity referred to in point (a) or (b) of this Section. “Sanctions” shall mean measures aimed at maintaining or restoring international peace and security enacted by the United Nations and/or the European Union and/or the Poland and/or the US, or any such sanctions law applicable to the company or undertaking's such as sectoral measures, economic and financial measures, or measures introduced against countries (embargoes), natural or legal persons or groups or non-state entities (blocking measures). Delivery Restrictions The following delivery restrictions are applicable for items to be provided for the Project: Any manufacturing or supply by an individual, entity or from a country of origin on which sanctions or embargoes are imposed by competent authorities in accordance with the law. No equipment (or parts thereof) and no materials can be manufactured in or imported from the Russian Federation or from parts of Ukraine which are not under factual control of the Ukrainian government in Kiev (currently: Crimea, Donetsk Province (Donetsk Oblast) and Luhansk Province (Luhansk Oblast)). No equipment or parts thereof can be manufactured or supplied by Russian companies, individuals, suppliers or companies from parts of Ukraine which are not under factual control of the Ukrainian government in Kiev (currently: Crimea, Donetsk Province (Donetsk Oblast) and Luhansk Province (Luhansk Oblast)). Any other individual, entity or country of origin deemed by the Republic of Poland as restricted or constituting a threat to the national security or security interests of the Republic of Poland.
- Inny okres
- Nieznany
- Maksymalna liczba wznowień
- 0
- Zamówienie jest objęte zakresem Porozumienia w sprawie zamówień rządowych (GPA)
- Nie
- Źródła kryteriów wyboru
- Dokumenty zamówienia
- Informacje o zastrzeżonych dokumentach są dostępne pod adresem
- https://westinghousenuclear.com/
- Zgłoszenie elektroniczne
- Dozwolone
- Adres na potrzeby zgłoszenia
- https://westinghousenuclear.com/
- Opis
- tomonrl@westinghouse.com
- Języki, w których można składać oferty lub wnioski o dopuszczenie do udziału
- angielski
- Katalog elektroniczny
- Niedozwolone
- Opis gwarancji finansowej
- As per agreement
- Termin składania ofert
- 19/05/2026 23:59:00 (UTC-05:00) Eastern Time, Lima
- Okres, przez który oferta musi pozostać ważna
- 3 Miesiące
- Wykonanie zamówienia musi odbywać się w ramach programów zatrudnienia chronionego
- Nie
- Warunki dotyczące realizacji zamówienia
- Terms&c Conditions to be provided after NDA/PIA
- Zasady finansowe
- as per agreement
- Organ odwoławczy
- Westinghouse Electric Poland Sp.z.o.o
- Informacje o terminach odwołania
- n/a
- Organizacja udzielająca dodatkowych informacji na temat postępowania o udzielenie zamówienia
- Westinghouse Electric Poland Sp.z.o.o
Informacje o zamówieniu
Zamawiający
Lokalizacja zamawiającego
Przybliżona lokalizacja miejscowości zamawiającego (Kraków). Dane: GeoNames, OpenStreetMap.
Szczegóły zamówienia
Analiza rynkowa i konkurencja
Historia zamawiającego
W ciągu ostatnich 2 lat ten zamawiający ogłosił 1 przetarg.
Pełny profil zamawiającego: Westinghouse Electric Poland Sp. z o.o.
Konkurencja i ceny
Branża „Maszyny przemysłowe”: woj. małopolskie na tle całej Polski.
| Wskaźnik | woj. małopolskie | Polska |
|---|---|---|
| Średnia liczba ofert | 2,5 | 2,4 |
| Postępowania z jedną ofertą | 43% | 41% |
| Mediana wartości umów | 267 tys. zł | 270 tys. zł |
| Połowa umów w przedziale | 138 tys.–540 tys. zł | 145 tys.–529 tys. zł |
Średnia liczba ofert w branży „Maszyny przemysłowe” w woj. małopolskim jest zbliżona do ogólnopolskiej.
Województwo: rozstrzygnięcia z ostatnich 2 lat (252). Polska: wszystkie rozstrzygnięcia w tej branży w bazie PrzetargHub (5 431). Wartości umów podają zamawiający w ogłoszeniach o wyniku. Przetargi w branży Maszyny przemysłowe.
Podobne przetargi z cenami
Najczęściej zadawane pytania
Ile ofert zwykle wpływa w podobnych przetargach?
Dla branży „Maszyny przemysłowe” w województwie małopolskim średnia liczba ofert to 2,5, a 43% przetargów kończy się złożeniem tylko jednej oferty.